Newsflash from Wednesday, 1 July 2026:
Drivers in eastern Crete should prepare for significant traffic disruptions on the Agios Nikolaos–Neapoli section of the Northern Road Axis of Crete (VOAK) on Wednesday, July 1 and Thursday, July 2, 2026.
According to official announcements, the temporary closure is necessary due to urgent geotechnical conditions near the Xeropotamos bridge area (chainage 8+300), where crews will carry out works to remove unstable rock formations.
Closure Hours
The road will be closed daily during the following times:
- 09:00 AM – 17:00 PM on both July 1 and July 2
Alternative Routes for Drivers
Traffic will be redirected depending on vehicle type and direction:
From Neapoli to Agios Nikolaos (small vehicles & buses):
Route via the Old National Road – Lakonia – Kritsa Junction – Agios Nikolaos.
From Agios Nikolaos to Neapoli (small vehicles & buses):
Traffic will be diverted exclusively through the Old National Road.
Heavy vehicles (trucks):
They will continue using the existing VOAK, with temporary stoppages during the day when works are paused to allow controlled passage.
What Drivers Should Expect
Motorists are advised to plan ahead, expect delays, and follow posted signage and traffic instructions. The works are considered necessary to ensure long-term safety along this stretch of the highway.
If you’re traveling in the area during these dates, allow extra time and consider using alternative routes where possible.
Source
Original announcement and details available at:
https://fonien.gr/voak-agios-nikolaos-neapoli-diakopi-kykloforias-12-iouliou-oi-enallaktikes-diadromes/




