BOAK Traffic Nightmare: Massive Delays Trap Drivers and Ambulances Near Heraklion and Chania

Newsflash from Monday, 5 October 2026:

BOAK Stau
BOAK traffic jam.

Monday morning turned into a traffic ordeal for drivers on Crete’s main highway, as roadworks brought entire sections of the BOAK (Crete’s northern coastal highway, connecting the island’s major cities) to a crawl.

The disruption was so severe that even ambulances struggled to get through.

Gridlock Near the Old KTEO

boak kykloforiako1 full

On Monday, October 5, 2026, traffic backed up significantly on the BOAK near the old KTEO (vehicle inspection center) [Google Maps], due to ongoing construction work in the area.

Vehicles crawled along at extremely low speeds, with long queues forming in both directions.

Perhaps most concerning: ambulances were forced to maneuver between stopped and slow-moving cars, weaving through traffic in an effort to reach patients as quickly as possible despite the chaos.

Lane Closures Near Chania: What to Expect

Expressway
BOAK Expressway in western Crete (Chania).

Separately, the Chania Police Department has announced long-term traffic restrictions on another section of the BOAK, this time due to hydraulic works.

Here’s the breakdown of affected areas and dates:

  • Mournies (a suburb of Chania)  [Google Maps]: Lane narrowing from October 5–7, 2026, 24 hours a day, between kilometer markers 03+580 and 04+450.
  • Mournies to Vamvakopoulou junction: Lane narrowing from October 2, 2026 to February 3, 2027 (yes, several months), 24 hours a day, between kilometer markers 00+050 and 01+800.
  • Souda junction (near the port town of Souda, Chania region): Lane narrowing from October 1–10, 2026, 24 hours a day, between kilometer markers 05+400 and 06+250. Overtaking lanes will be completely closed in this section.

The company managing these works, Diktaion Paraxoriseis (the BOAK’s concession operator), stated that if work finishes ahead of schedule, normal traffic flow will be restored earlier than planned.

They’ve also confirmed that all necessary safety measures are in place, with temporary signage installed to keep drivers informed throughout the affected zones.

What Does This Mean for Visitors?

  • Build in extra travel time if you’re driving the BOAK between Heraklion and Chania, especially near the old KTEO and the Mournies–Vamvakopoulou–Souda stretch.
  • Expect lane narrowing to last months, not days, in the Mournies to Vamvakopoulou section — this isn’t a quick fix, so plan accordingly for the rest of 2026 and into early 2027.
  • Drive at reduced speed through all work zones and follow temporary signage and traffic police instructions carefully.
  • If you’re renting a car, check real-time traffic conditions before setting off, particularly during peak morning hours.
  • Emergency vehicles may need to pass — stay alert and make room when possible, as ambulances have reported serious difficulty navigating these congested areas.
  • Consider alternative routes where available, especially if you’re not in a rush, to avoid the most congested sections entirely.

With roadworks expected to continue for weeks (and in some cases months), patience will be essential for anyone relying on the BOAK to get around Crete in the coming period.

Sources: Patris.gr and Hania.news

Oval%403x 2

Don’t miss the daily tips and news about Crete!

We don’t spam! Read our privacy policy for more info.

Leave a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Scroll to Top