Hersonissos Promenade Gets a New Life: Major €8 Million Waterfront Redesign Underway

Newsflash from Thursday, 15 January 2026:

Hersonissos port 1
Demolition work on the promenade near the harbour of Hersonissos.

A long-awaited transformation has officially begun in Hersonissos, as construction works start on the complete redesign of the promenade and land zone of the town’s port. After decades of planning and discussion, bulldozers are now on site, marking the beginning of one of the most important urban regeneration projects ever undertaken in the area.

The project, with a total budget of €8 million, included the full redevelopment of approximately 800–900 meters of the port’s land zone, stretching from the Port Authority building to the Hersonissos Police Department. The aim is to deliver a modern, functional, and environmentally upgraded waterfront that reflects both the history and the dynamic future of Hersonissos.

abriss hersonissos 1
Demolition work on unauthorised buildings on the Hersonissos promenade.

A Promenade Designed for People

The new promenade will be organized into three distinct zones:

A frontage zone next to buildings, allowing space for cafés and restaurants to operate outdoor seating.
A central pedestrian zone, which will function as a promenade and also allow access for emergency and service vehicles when required.
A green and leisure zone, featuring urban furniture, trees, benches, and modern lighting.

Together, these zones will form a unified promenade of at least 12 meters in width, ensuring accessibility, comfort, and multiple uses for residents and visitors alike.

hersonissos port 2026
Port of Hersonissos in January 2026.

Respecting History and the Local Economy

Special emphasis is being placed on the protection and showcasing of archaeological finds, including remains of the ancient Roman port, both on land and underwater. Around €3 million has been allocated specifically for archaeological research, in close cooperation with the relevant authorities.

At the same time, the municipality has stressed that the project is being implemented with full respect for local businesses and tourism activity. Clear instructions have been given to ensure that the area remains accessible throughout the construction period, minimizing disruption during the busy season.

abriss hersonissos 2
Removal of unauthorised structures on the coastline in Hersonissos.

Timeline and Vision

The project is funded by the Recovery and Resilience Fund, with a completion deadline set for 2026, while the goal is to have a large part of the promenade ready by summer. Supervision is carried out by the Ministry of Infrastructure’s specialized public works service, ensuring high standards and close coordination on a daily basis.

As works progress, the visual change is already evident. The redesigned promenade is expected to significantly enhance the image of Hersonissos, supporting sustainable tourism development and improving quality of life for residents.

With this flagship project, combined with other planned infrastructure and road works, Hersonissos is steadily moving toward a more sustainable, modern, and attractive future by the sea.

NeaKriti

Oval@3x 2

Don’t miss the daily tips and news about Crete!

We don’t spam! Read our privacy policy for more info.

Oval@3x 2

Don’t miss the daily tips and news about Crete!

We don’t spam! Read our privacy policy for more info.

Leave a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Scroll to Top